3kw Digital Inverter Generator - Tiger

Output Type: AC Single Phase
Rated Power: 3kw
Rated Current: 22A
Noise Level (2000/14/Ec): 72dB(a)
Running Time at 1/2 Loaded: 6 Hours
Fuel Consumption Full Load: 1.7L/H
Customization:
Manufacturer/Factory, Group Corporation

360° Virtual Tour

Diamond Member Since 2008

Suppliers with verified business licenses

Jiangsu, China
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
In-stock Capacity
The supplier has In-stock capacity
Product Certification
The supplier's products already have relevant certification qualifications, including:
CE
EU Type
to see all verified strength labels (12)

Basic Info.

Model NO.
INF3800
Displacement
181.6cc
Engine Speed
3000-3800rpm
Certificate
CE,EPA
Start Type
Manual or Electric Start
Net Weight
30kgs
Transport Package
Retail Carton
Specification
CE, EPA, CARB.
Trademark
PMT or OEM
Origin
China
HS Code
85022000
Production Capacity
1000PCS / Month

Product Description

3kw Digital Inverter Generator - TigerDurable, Lightweight, open frame type Tiger inverter generator : Fuel consumption lower, Noise quieter, use for safer,weight lighter!!! 
BETTER IN TIGER HERE!!!   100% COPPER USED
1) PROFESSIONAL.
A professional manufacturer on generator manufacturing for 17 years.
2) RELIABILITY QUALITY
Same graded on quality and technics level compared with YAMAHA and Honda inverter generator, Same parts even more better.
3) INTELLIGENT DESIGN
Invested more than USD5 millions to developed our completely own design.
FUEL CONSUMPTION LOWER ! NOISE QUIETER ! USE FOR SAFER ! WEIGHT LIGHTER !
4) RAPID SERVICE
A. Factory warranty and parts provide direct. All accessories and parts cost are reasonable.
B. Warranty spare parts delivery: Within 3 working days after confirmed.
The ordered spare parts delivery: Within 10 working days after paid. (except Special parts order)
5) FULL BACK UP ON SERVICE / MAINTAIN / REPAIR TRAINING
SAIL can offer 6-10 days service training in our company in China for your engineer or service term.
6) RELIABILITY QUALITY
Every spare part have to pass 5 steps very strict quality control, inspect,
Every generators are tested with loaded for 1-2 hour before shipping, Make sure all generator running in 100% PERFECT.


Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

360° Virtual Tour

Diamond Member Since 2008

Suppliers with verified business licenses

Manufacturer/Factory, Group Corporation
Management System Certification
ISO 9001